TABLE OF CONTENTS
PART 1
Section 101. Short Title
PART 2
PART 2. PURPOSE, AUTHORITY, APPLICATION AND INTERPRETATION
Section 201. Purpose
Section 202. Authority
Section 203. Application of Regulations
Section 204. Interpretation
PART 3
Section 301. Language Interpretation
PART 4
PART 4. PLAN PROCESSING PROCEDURES AND REQUIREMENTS
Section 401. Overall Plan Processing Procedures
Section 402. Pre-application/Sketch Plan (Optional)
Section 403. Preliminary Plan: Procedure
Section 404. Final Plan: Procedure
Section 405. Final Minor Plan: Procedure
Section 406. Final Lot Addition Plan: Procedure
Section 407. Preliminary Plan: Specifications
Section 408. Final Plan: Specifications
Section 409. Final Minor Plan: Specifications
Section 410. Final Lot Addition Plan: Specifications
PART 5
PART 5. DESIGN AND IMPROVEMENT STANDARDS
Section 501 Purpose
Section 502 General
Section 503 Site Design
Section 504. Blocks
Section 505. Lots
Section 506. Driveways and Service Drives
Section 507. Sidewalks
Section 508. Street System Design and Construction
Section 509. Other Street Design and Standards
Section 510. Street Names
Section 511. Street Signs
Section 512. Monuments and Markers
Section 513. Lighting
Section 514. Water Supply
Section 515. Sewage Service Facilities
Section 516. Fire Hydrants
Section 517. Common Facilities
Section 518. Easements
Section 519. Design Standards in Floodplain
Section 520. Utilities
Section 521. Steep Slope
Section 522. Wetlands
Section 523. Important Natural Habitats
Section 524. Traffic Impact Study
Section 525. Space Between Buildings for Land Development
Section 526. Erosion and Sedimentation and Stormwater Management
PART 6
PART 6. IMPROVEMENT AND MAINTENANCE GUARANTEES
Section 601. General Statement
Section 602. Financial Security for Improvement Guarantees
Section 603. Inspection of Improvements During Construction
Section 604. Dedication of Improvements
Section 605. Maintenance Guarantee
Section 606. As Built Plans
PART 7
Section 701. Grant of Power
Section 702. Purpose, Authority and Jurisdiction
Section 703. Plat Requirements and Processing Procedure
Section 704. Design Standards
Section 705. Improvement and Construction Requirements
Section 706. Fees and Permits
Section 707. Alteration of Requirements
Section 708. Enforcement, Penalties, Violations, Appeals, Severability, and Amendments
PART 8
Section 801. Filing Fees
Section 802. Administrative Fee Schedule
Section 803. Municipal Engineer Review Fee
Section 804. Other Fees
PART 9
PART 9. MODIFICATION OF REQUIREMENTS
Section 901. Application of Modification Provisions
Section 902. Requests for Modification
Section 903. Granting of Modification
Section 904. Denial of Modification
Section 905. Displaying on Plans
PART 10
PART 10. ENFORCEMENT, AMENDMENTS VIOLATIONS, APPEALS, PENALTIES, SEVERABILITY, AND REPEALER
Section 1001. Administration and Enforcement
Section 1002. Amendments
Section 1003. Violations
Section 1004. Appeals
Section 1005. Penalties
Section 1006. Severability
Section 1007. Repealer
Section 1008. Right-of-Entry
PART 11
PART 11. EFFECTIVE DATE AND ENACTMENT
Section 1101. Effective Date
Section 1102. Enactment
APPENDICES
Appendix 1. Miller Township Subdivision & Land Development Plan Application
Appendix 2. Sample Financial Security Statement
Appendix 3. Sample Performance Bond
Appendix 4. Sample Offer of Irrevocable Dedication
Appendix 5. Listing of Plan Notes
Appendix 6. Sample Easement Agreement for Facilities Construction, Repair, and Maintenance
Appendix 7. Sample Modification Request Form
Appendix 8. Sample Agreement to Extend the Time for Rendering and Communicating a Decision on Certain Preliminary and/ or Final Subdivision/ Land Development Plans
Appendix 9. Timing Provisions for Subdivision and Land Development in the Municipalities Planning Code

